Merchandise Description

Rapid Particulars

Packaging & Delivery

Merchandise Range

ABOUT US:

As your one-end source, AT PRECAST,we design and style, maker and distribute precast concrete add-ons which includes the Lifting Programs and Anchoring programs Coil and Ferrule Inserts. for Concrete and Prefabricated spot.

As a leader in developing concrete accessory products, our principal objective is to create products that are safer, more rapidly and a lot more expense efficient.

With much more than entirely 50 years working experience, our entire staff is dedicated to provide you with the best buyer provider and competitive costs. Our sales pressure are CZPT to answer your questions quickly and offer you you specialized assistance .

Assurance:

100% quality manufacturing.
 We guarantee that our products meet your supplied specifications
 Extremely competitive pricing
 Delivery to your port or front door
 4 —- 8 week lead times
 We handle all paperwork
 Partial container orders
 Flexible payment options
 Unique tooling options
 Full range of packaging options from bulk to retail ready
 Complete testing services available

 

FAQs:

one. In which is your area?

We are located in HangZhou Metropolis of China and are shut to Airport. It requires 30minuts by auto from Liuting Airport our organization.

2. How lengthy has the organization been set up?

AT Market was established in 2009. There is 6 a long time exporting ordeals.

3. How numerous staff do you have?

Administration / sales    4
Engineering / design and style as our partner     eight
Production as our associates a hundred and twenty
Good quality assurance / inspection   10

4. Which countries do you export to?

U.S.A, Germany, France, Italy, British isles, Brazil, Center east of Asia, Thailand,

5. What proportion of your goods are exported?

100% of our manufacturing are exported to all more than the world.

six. How prolonged does it take to receive samples?

a) Sample:30-45days following order 
b) Sample:30days following sample ending.
c) The lead time is the basic production period of time and does not consist of the transportation time.

7. New merchandise development approach

Acquired tooling buy and sample order with fifty% deposit—Keep a assembly with the relation dept. to make sure the establishing routine—Design and style pattern, fixture and gauge and making them in our residence—mould steel purchasing—Machining—Inspection—Deliver out the sample with first inspection report.

eight. How lengthy is the production direct time?

Mass Production: 90days following sample acceptance by yours.
The lead time is the general generation period including the transportation time.
We could make some special generation arrangement efficiently if customer has urgent want.

9. What basis can we purchase products?

We typically provide customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF consists of the freight price to your nominated sea port.
We do provide clearance of goods which wants to be dealt with by a regional freight forwarder.
All neighborhood expenses and taxes are the accountability of the buyer. We are content to provide advisement on transport if necessary.

ten. What are the payment conditions?

Payment conditions are negotiable and will improve for long time period customers.
In the course of the initial phases, we request fifty% of tooling charge in CZPT with the equilibrium payable on acceptance of samples.
Generation orders CZPT negotiable. We favor 50% deposit and the harmony by T/T just before sails. But often T/T 30 times soon after sails would also acceptable.

11. Which currency can we purchase in?

We can offer in USD / Euro currency / GBP.

12. How long does it take to ship products from China by sea?

It requires about 5 weeks to European ports plus 1 week customs clearance, so you can get the container inside 6 to 7 weeks. It normally takes about 2 months to east CZPT and 3 months to west CZPT US ports. All sea merchandise are shipped from HangZhou Port.

13. How extended does it just take to ship merchandise from China by air?

It normally takes about 7 times to all key locations.

fourteen. Can we visit the manufacturing facility to carry out an audit?

Of course, you are welcome to check out our companion factory by prior agreement.

fifteen. How do we retain shopper confidentiality?

We are happy to signal Confidentiality Agreements with consumers and will honor them.

16. Which languages do we do enterprise in?

Even though we do organization with several countries around the globe, we can only communicate properly in Chinese English.
All details provided must for that reason be provided in this sort.

17. Is there a minimum quantity of organization needed to perform intercontinental acquiring?

There are no minimum volumes, but the rates of the goods, in addition the mounted charges of importing can make it more inexpensive to purchase in large volumes. All prospective consumers will be assessed on an specific foundation to decide if it appears a practical option for all events to create a romantic relationship.

18. What kind of areas you are specialized in?

Our company includes 2 areas,
a single is for design precast like lifting program, rigging hardware metallic areas.
 
An additional is custom-made metal company of quality sand castings, investment castings, lost foam castings, hot forgings, cold forgings, stampings, machined parts, injectionmolded plastics parts, etc.

19. Which sort of equipments do you have?

Forging friction press 160Ton, 300Ton, 630Ton, 1200Ton
Casting CZPT of 200kg, 500kg,1000kgs, 2000kgs
Press of 63ton, 120tons
CNC Machining heart
CNC Vertical Lathe
CNC Lathe center
Unexciting equipment
Drilling device
 

The lubricating oil external circulation products of the worm equipment reducer equipment has lower oil temperature. The worm equipment reducer plans to traverse its power. The worm equipment is created of non-ferrous metal. Grasp knowledge worms are generally produced of difficult metal. As a result, employing a lot of heat in the application, coupled with the impact of the ambient temperature, it is challenging to control the temperature of the reducer. Use within the temperature assortment. When the ambient temperature is reduce than 0℃, the doing work temperature of the worm gear reducer must be controlled at -40℃~40℃. It is suggested to warmth or use a reduced freezing stage lubricant before the oil is totally dissolved.

China Hot selling Customized Small Straight CZPT     near me supplier